Solar & batteries with Black Hills Energy (Colorado Electric)

Black Hills Energy is the investor-owned electric utility for much of southern Colorado, including the Pueblo area. Unlike Xcel, it still runs an open solar incentive program: a $1-per-watt rebate for income-qualified households, small per-kWh production payments for everyone else, and up to $1,000 toward a solar-paired battery. The program runs under Black Hills’ 2023–2026 Renewable Energy Standard plan, so terms after 2026 are an open question.

Investor-owned26 Colorado communities on the state map

Utility type

Investor-owned utility

How exports are credited

Exports banked 1:1 as kWh credits

System size limit

Up to 200% of reasonable and expected annual consumption.

Net metering, in plain English

As an investor-owned utility, Black Hills follows Colorado’s full net-metering statute. Excess solar is added to your banked energy for future months, and the system can be sized to supply up to 200% of your reasonable expected annual use.

Sources & dated facts

  • Systems may be sized to supply no more than 200% of the customer’s reasonable and expected annual electricity consumption; excess energy is added to banked energy for future months.As of Sep 23, 2026 · source
  • Application fees: $380 for systems up to 25 kW AC; $760 for 25 kW to 1 MW.As of Sep 23, 2026 · source
01

Who Black Hills serves

Black Hills Energy’s Colorado electric territory is centered on Pueblo and parts of the Arkansas Valley. Nearby towns like La Junta, Lamar and Trinidad run their own municipal utilities, and rural areas may be on a co-op like San Isabel, so we confirm the utility on your bill before we design.

02

The production incentive: what it’s worth

The general production incentive is $0.0025 per kWh — a quarter of a cent. On a system producing around 8,000 kWh a year, that’s roughly $20 a year. It’s real money, but it won’t change whether solar pays off for you, and we won’t pretend it does.

The income-qualified track is a different story. A $1-per-watt rebate takes a large bite out of a $2.80–$3.25 per-watt system, and $0.038 per kWh in production payments adds up to meaningful money over the years. If your household may qualify, it’s worth checking before anything else.

03

Batteries on Black Hills

Black Hills pays $100 per kW for a battery paired with solar, capped at $1,000. That helps, but it doesn’t make a $15,500–$19,000 battery pay back on bill savings. The stronger reasons to add storage here are backup and Colorado’s 10% battery tax credit, which covers tax years through 2026.

04

The 2026 clock

Black Hills’ current incentives come from its 2023–2026 Renewable Energy Standard plan. We haven’t seen the terms for 2027 onward, so if an incentive is part of your decision, apply while the current plan is in force and treat anything after 2026 as unknown.

Rebates & programs

Programs change often. Status shown is what we could confirm on the date listed — always check with the program before you count on it.

Colorado Solar Program — income-qualified / disproportionately impacted

Open

For qualifying households with systems from 0.5 to 25 kW: a $1-per-watt upfront rebate, a production incentive of $0.038 per kWh, and up to $1,000 for a paired battery.

  • IQ/DI participants (0.5–25 kW): $1/W solar rebate; PBI $0.038/kWh; paired storage rebate $100/kW, maximum $1,000.(source)
  • Program operates under Black Hills’ Renewable Energy Standard Compliance Plan for 2023–2026; terms for 2027 onward not yet published.(source)
Program page

Colorado Solar Program — general residential and small business

Open

For everyone else with systems from 0.5 to 25 kW: a small production incentive per kWh and up to $1,000 toward a solar-paired battery.

  • General participants (0.5–25 kW): PBI $0.0025/kWh; paired storage rebate $100/kW, maximum $1,000.(source)
Program page

Colorado Solar Program — commercial (25–250 kW)

Open

Commercial systems from 25 to 250 kW earn a production incentive of $0.02 per kWh.

  • Commercial (25–250 kW): PBI $0.02/kWh.(source)
Program page

FAQ

Questions we hear

Is Black Hills Energy’s solar program open in 2026?

Yes, as of September 2026 the Colorado solar program shows as open under its 2023–2026 plan. What happens after 2026 hasn’t been published.

How much solar can I put on a Black Hills home?

Up to 200% of your reasonable expected annual consumption. We usually size closer to 100% because surplus beyond your use earns little.

What does the $0.0025/kWh production incentive add up to?

About $2.50 per 1,000 kWh. A typical home system earns tens of dollars a year from it.

What does Black Hills charge to apply for net metering?

$380 for systems up to 25 kW AC and $760 for 25 kW to 1 MW, per the program page as of September 2026.

Does Black Hills pay commercial solar incentives?

Yes — commercial systems from 25 to 250 kW earn $0.02 per kWh produced under the current program.

Get honest numbers for your roof

Our Colorado crew looks up your utility’s current rules, models your roof, and tells you straight — including when solar or a battery won’t pay off.