Who issues your permit
Inside most cities and towns, the municipal building department issues the permit: Fort Collins Building Services, Boulder Planning & Development Services, Golden’s Building Division, Lakewood Public Works and Denver’s Community Planning & Development, for example. Outside city limits, it’s usually the county.
Some areas use a regional office. In Colorado Springs and much of El Paso County, the Pikes Peak Regional Building Department handles both building and electrical permits. In many smaller jurisdictions, the state electrical board issues and inspects the electrical permit.
Unincorporated communities follow the county. Evergreen, for instance, isn’t a city — it’s permitted through Jefferson County, where rooftop solar needs an electrical permit from Building Safety but no zoning permit or plan review.
SolarAPP+ in Colorado
SolarAPP+ is an automated plan-review tool that approves code-compliant residential solar instantly. In Colorado, full SolarAPP+ permitting is used by the City and County of Denver, Wheat Ridge, Bennett, Alamosa County and Gilpin County.
Since October 28, 2025, the state electrical board has also used SolarAPP+ for electrical plan review of residential solar and storage in the more than 200 jurisdictions where the state issues electrical permits. That speeds the electrical side there, though a local building permit may still be separate.
A proposed statewide mandate was stripped from HB25-1096 before it was signed in May 2025, so adoption remains voluntary. The state has offered grant funding to jurisdictions that adopt automated permitting.
What the permit reviews
Reviewers check that the roof structure can carry the array (with Colorado snow and wind loads in mind), that the electrical design meets code — including rapid shutdown, labeling and the connection to your panel — and that fire-access pathways on the roof are respected. Ground mounts add footing design and sometimes setbacks.
Batteries add their own review of mounting location, clearances and the backup wiring. Historic districts and some mountain jurisdictions add zoning or design review on top.
Timelines and fees
Instant approval under SolarAPP+ is the fastest case. Elsewhere, review can take anywhere from a same-day counter review to several weeks, depending on the jurisdiction and its backlog. Inspection scheduling adds more.
Colorado has had a law limiting what jurisdictions charge for residential and commercial solar permits, but we haven’t confirmed how its caps apply today, so we don’t quote a fee here. We include permit fees in our quote and tell you the jurisdiction’s actual fee.
Utility interconnection is a separate approval
A building permit says your system is safely built; interconnection approval says your utility accepts it on its grid. Xcel, co-ops and municipal utilities each run their own application, may require an engineering review for larger systems, and must set up metering for net metering. Some also require their own inspection or a participating-contractor designation for rebates.
The system can’t be turned on until both are complete. It’s common for the permit to be finaled before the utility gives permission to operate, and that gap is normal.
FAQ
Questions we hear
Can I install solar in Colorado without a permit?
No. Grid-tied solar needs a building and/or electrical permit and utility interconnection approval. An unpermitted system can cause problems with insurance, resale and the utility.
Which Colorado cities use SolarAPP+?
As of September 2026, full SolarAPP+ permitting is used by Denver, Wheat Ridge, Bennett, Alamosa County and Gilpin County. The state electrical board also uses it for electrical review in 200+ state-inspected jurisdictions.
Is SolarAPP+ required statewide in Colorado?
No. A proposed mandate was removed from HB25-1096 before it became law in 2025, so each jurisdiction decides.
How long does a solar permit take in Colorado?
From instant in SolarAPP+ jurisdictions to several weeks elsewhere, plus inspection scheduling and a separate utility interconnection approval.
Who permits solar in Evergreen?
Jefferson County, because Evergreen is unincorporated. Rooftop solar there needs an electrical permit from Jeffco Building Safety but no zoning permit or plan review.
Do I need a separate permit for a home battery?
Usually it’s reviewed as part of the same electrical permit when installed with solar, or as its own electrical permit when added later. Requirements vary by jurisdiction.