Skip to content
AIColorado Solarby Discovery Clean Energy

Gunnison County · Central Mountains

Solar in Marble, Colorado

Solar math in Marble starts with Holy Cross Energy. This Gunnison County community — statutory town of about 133 people (2025 Census estimate) at around 8,010 feet — gets strong Colorado sun, but the utility’s credit rules set the payback.

Statutory town8,010 ft

At a glance

Population
133
Census Vintage 2025
Elevation
8,010 ft
USGS
County
Gunnison
Government
Statutory town

Electric utility

Territory from the Colorado Energy Office utility map (data edited July 2026). The utility on your bill is the final word — we verify by address.

01

Marble’s electric utility

Holy Cross Energy is the utility on the state’s territory map for Marble. In practice that means your system is interconnected under its rules — it banks exported solar as kWh credits that offset later use one-for-one.

As always, the utility printed on your bill beats any map; we verify it by address before quoting.

02

What Marble’s setting means for panels

High-elevation homes like those in Marble (~8,010 ft) see excellent summer production and tougher winters: snow shedding, structural snow loads and terrain shade drive the design, and backup power is often the headline benefit.

03

Getting a solar permit in Marble

We handle permitting in Marble end to end. Depending on the address, that means the town’s own building department, Gunnison County’s building office, or the State Electrical Board, which issues electrical permits in many smaller Colorado jurisdictions.

04

A quick local snapshot of Marble

Its population declined about 1.5% between 2020 and 2025 (135 → 133). It ranks #4 by population among the communities in Gunnison County, and its nearest neighbors are Snowmass Village (17 mi), Mount Crested Butte (17 mi), Crested Butte (18 mi).

Distance from our Denver shop: about 126 miles direct. We serve the whole state, but we’re upfront that remote installs are scheduled in batches.

FAQ

Questions we hear

Who is the electric utility in Marble, Colorado?

The Colorado Energy Office territory map shows Holy Cross Energy. Confirm with the name on your bill — we verify by address.

What happens to extra solar power in Marble?

Your utility, Holy Cross Energy, banks exported solar as kWh credits that offset later use one-for-one. That rule — more than sunshine — decides how to size a system here.

How much will panels produce in Marble?

Well-placed Colorado arrays typically produce roughly 1,300–1,600 kWh per kW each year (NREL PVWatts). Enter your address in our Solar Studio for an hour-by-hour estimate at your exact location.

Will an installer actually come to Marble?

Yes — we’re about 126 miles away in Denver and serve every county. Remote projects are batched for scheduling; we’ll give you honest timing.

Get honest numbers for your roof

Our Colorado crew looks up your utility’s current rules, models your roof, and tells you straight — including when solar or a battery won’t pay off.

Call nowFree estimate